A. Site Evaluation & Planning • Conduct site visits to assess topography, drainage, utilities, and space constraints. • Confirm enclosure size and placement based on city waste collection needs. • Ensure accessibility for waste collection trucks and compliance with ADA requirements. • As needed, provide assistance and support for public hearings or city planning reviews (if required). Assume two (2) public hearings will be held. B. Conceptual and Final Design • Develop two to three conceptual designs for city review. • Incorporate materials and finishes that align with city aesthetics and durability needs. • Provide 70%, 90% and 100% design construction drawings. • Provide electrical, water and sewer connection design. • Coordinate with SCE for electrical connection. Coordinate with city staff for water and sewer connections. • Provide structural design (concrete, masonry, or metal) and calculations. • Provide for drainage and stormwater management considerations and plans. • Provide for enclosure security features (gates, locks, lighting). • Provide for parking lot and landscaped area plans of affected areas. • Provide parking lot striping plans of parking lot affected areas. • Provide temporary traffic control plans. • Provide for temporary placement of trash bins and pickup during construction. • Comply with zoning, fire codes, and environmental standards. • Provide project specifications at 90% and 100% design. City to provide boiler plate/front end portion of specs. C. Cost Estimation and Value Engineering • Provide cost estimates at 70%, 90% and 100% design. • Recommend value-engineering options to maintain quality within budget