The successful firm will provide comprehensive design engineering services, surveying, right of way research and coordination with property owners, Imperial Irrigation District, Seeley County Water District, and other affected utility companies for the permitting, development of plans, specifications, and cost estimates for this project. The successful firm will comply with current Caltrans Standard Specifications and Plans to be incorporated into County boilerplate special provisions and latest Manual on Uniform Traffic Control Devices (MUTCD). In addition, the successful firm shall also ensure compliance with the Standard Specifications for Public Works Construction, (Greenbook) 2021 Edition for asphalt concrete and oil products being specified. Work requiring coordination and permitting with Imperial Irrigation District and/or Seeley County Water District shall be completed using required standards by respective agencies and included in the County’s boilerplate special provisions. These services will be needed during the course of the work from date of award of the project through completion. Consultant shall provide a dedicated full-time person or persons as needed to provide Engineering Services for this specific project which is funded with local and state funds. The Engineer in charge of the project shall be a California licensed Civil Engineer.