Demolition and Remediation of a commercial building at 16756 and 16766 Arrow Boulevard. The work shall be done in two (2) phases with one (1) mobilization. Remediation: Qualified contractor will remove all asbestos and lead as identified in provided surveys and submit all clearances, manifests, commissioning report, and closure packages as required. Demolition: Qualified contractor shall remove everything on the site per the contract documents, including, but not limited to, the building, slab, footings, and all underground utilities. All utilities have been turned off and abandoned at site. A demolition permit is required (Exhibit A) prior to commencement of work. All inert waste, miscellaneous concrete, asphalt, concrete patio and walkways, out structures, and irrigation lines are to be removed. Public sidewalks are to remain and repaired if damaged during demolition. Remove all trees, bushes, landscaping, and fencing located within the property lines. Contractor will be responsible for dust control during operation. Grading: Grading is to be done and any import or export of soil that may be necessary must be included. Site should be reasonably level upon completion. Permit(s): Demolition permit is required. A City of Fontana Building Demolition Requirements packet shall be filled out and submitted at the time of permit request. (See Exhibit A). Contractor is required to obtain any other necessary Agency permits to perform abatement, demolition or grading activities, as applicable. Inspections: The City Building Department is open Monday through Thursday. Any inspections called for on Fridays and Saturdays will be overtime inspections with all costs incurred by the contractor, unless specifically authorized by the project manager.