Demolition (including clearing and grubbing, trees, walkways, curbs, irrigation, signs, benches, etc.) Stormwater Pollution Prevention Plan (SWPPP), Spec Section 01571 Earthwork (excavation, shoring, soil export, soil import, backfill, compaction) Underground Infrastructure (including storm drain system, pretreatment system, yard piping, slide gate, and infiltration galleries) Landscaping (including planting, soil preparation. Lighting (MUSCO sport lighting, path lighting, security lighting) Electrical Service & Components Instrumentation (flow meter, level sensor, hydrocarbon sensor, intrusion alarms, and Programmable Logic Controller cabinets) Site Furnishings (bollards, rhino gates, benches, hydration stations, trash/recycling receptacles, fitness equipment, and educational signage) Maintenance Access Road (concrete road, pavers, and driveways) Baseball and Soccer Fields and Appurtenances (including fencing, dugout, equipment, storage, and bleachers) Permeable Pavement Parking Lot (Pavement Striping, Marking, Stop Signs, Parking Signage, and Wheel Stops) Traffic Control