1. All plans proposed should include detailed billing. 2. Hub site (5039 Dudley Ave., McClellan, CA 95652) connections must be able to: • Installation of Point-to-Point services as requested by the District (e.g. 1 remote sites between 1 Gbps up to 10 Gbps delivered to collector circuit of 10Gbps). 3. Host site (3136 Howard Street, McClellan, CA 95652) • Point-to-Point services as requested by the District (e.g. 1 remote sites between 1 Gbps up to 10 Gbps delivered to collector circuit of 10Gbps). 4. Cost Proposal will include: • Costs for Services by site – See Cost Proposal • Notes: i. The District operates a “hub and spoke” network topology. 5. All sites listed must have the option to upgrade bandwidth incrementally as needed during the term of the contract. 6. All sites listed must have the option to downgrade bandwidth as needed during the term of the contract. 7. Five-year (60 Month) term and Three-year (36 Month) term with option for two (2) annual extensions. Contract extensions and associated pricing must be included in original contract. Unless otherwise agreed upon, the contract start date will be July 01, 2026.