The general nature of the project consists of furnishing all labor, material, equipment, services and incidentals required to remove the existing service meter panel and main branch circuit service panel, rework existing branch circuit conduits from MP and route to new MS via new in grade pull box, install new wiring to existing loads, coordinate with the utility company and install new 400 amp service equipment, coordinate with the utility company and install underground service entrance conduit for new electrical service equipment, install protective bollards at new electrical service equipment, install new concrete pad for new electrical service equipment, install branch circuit, receptacle, and telephone backboard in modular building telecom closet, coordinate with telecom utility company and install new conduit riser from telephone pole to modular building telecom closet, install conduit and in grade pull box for future electrical vehicle chargers, trench and repair surface for all new underground conduits.