Specifications include, but are not limited to: - Installation of the new sound and lighting system in replacement of all existing sound and lighting system equipment in the MPR. Demolition and removal of existing sound and lighting equipment including the return to the district or disposal of the existing sound and lighting equipment. - Mounting and rigging of speakers and lights; installation of cabling, conduits, clamps and connections; installation of new equipment in equipment rack; connection, integration, and programming of all components of the new system for best performance and distribution in MPR. - All miscellaneous system components including, but not limited to, cables, clamps, rigging materials, termination equipment, punch blocks, patch panels, blackboards, and any other related items shall be furnished and installed by the contractor. - Furnish all conduits, junction boxes, conductors, equipment plugs, terminal strips, etc., and labor to install a complete and operable system. - Cables within racks or cabinets shall be carefully cabled, laced, and numbered for identification.