In general terms, the Project includes the following: As set forth in the Project Bid Documents, the proposed work consists of the new construction of eleven (11) buildings distributed throughout Ontario Grand Park to support both visitors and park staff. The scope includes structural and architectural work for each building, as well as coordination with site work performed under Landscape and Civil contract drawings. Phase A will be the Northwest portion of the Park on the corner of Archibald Ave and Grand Park St. See exhibit “Grand Park Phase A.” This will include the dog park, restroom, parking lot and all trails that are included in the exhibit along with any utility work that will be needed to make the amenities in this Phase operable. Phase A is intended to open before the rest of the park, early summer 2026. The buildings feature varied exterior wall systems including wood framing and concrete masonry units (CMU), with standing seam metal roofing. Interior construction includes gypsum wallboard partitions on metal studs and CMU interior walls. Restrooms, acoustical ceilings, lighting, and HVAC systems are included where noted in the construction documents. This project requires coordination with site improvements and adherence to design intent as established by SWA Landscape Architect