The work consists of mobilization and demobilization; clearing, grubbing, and environmental protection; public posting and notification; traffic regulation and construction area signs; utility potholing; thermoplastic marking & striping removal; sanitary sewer cleanout, water meter, water valve, and miscellaneous utility box adjustments to grade; existing arch culvert, and existing storm inlet removal; storm drain pipe, City standard Type G0 and G5 curb inlet, and City standard storm drain manhole installation; asphalt concrete surface removal; City standard curb, gutter, sidewalk, stamped concrete, driveway, and reinforced valley gutter installation; ADA compliant curb ramps and retrofit detectable warning surface at existing curb ramps; roadway pavement subgrade preparation; asphalt concrete pavement; deep lift AC plug; curb paint, thermoplastic markings; install sign & post; site clean-up and removal of any remaining construction materials or debris, sweeping, removal of any and all traffic regulation and construction area signs; and removal of all environmental protection in South San Francisco, CA at the intersection of Miller Avenue and Chestnut Avenue, Grand Avenue and Orange Avenue, and Randolph Avenue and Madrone Avenue