0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 65 0003 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0004 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0005 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 48 0006 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0007 130100 JOB SITE MANAGEMENT LS LUMP SUM 0008 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0009 130640 TEMPORARY FIBER ROLL LF 1,500 0010 130680 TEMPORARY SILT FENCE LF 1,980 0011 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0012 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM 0013 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 2 0014 210212 DRY SEED (SQFT) SQFT 3,250 0015 210350 FIBER ROLLS LF 68 0016 210610 COMPOST (CY) CY 13 0017 390136 MINOR HOT MIX ASPHALT TON 26 0018 411105 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 23 0019 510092 (F) - STRUCTURAL CONCRETE, HEADWALL CY 5.7 0020 510502 (F) - MINOR CONCRETE (MINOR STRUCTURE) CY 1