The Amphibious Vehicle Test Branch (AVTB) intends to procure comprehensive crane services, including equipment and qualified personnel, to facilitate the determination of the Vertical Center of Gravity (VCG) and Longitudinal Center of Gravity (LCG) for the Amphibious Combat Vehicle Recovery Variant (ACV-R). This testing will utilize the suspension method, as prescribed by AVTB Test Operations Procedure (TOP-001 v3.0).
Please see attached RFQ for detailed information.
Amendment 1 issued to affect the following:
1. Page 3 of the solicitation, paragraph 6 added the following: Provide a technical approach with a detailed description of specification of the proposed services in the SOW. The inf ormation submitted must be suf ficient for the Government to assess the technical capability of the proposed service or item(s) to fulf ill the required ef fort. Quotations shall provide all other required documentation specified herein.
2. Page 3 of the solicitation, paragraph 7 added the following: Award will be based upon the following factors:
(1) Technical Approach – acceptable/unacceptable
(2) Price
3. Added page 4 to include the Statement of Work (SOW).
4. Contract Line-Item 0001, revised to read “up to 4 days (NOT TO EXEED 40 HOURS FOR THE ENTIRE SERVICE).
5. Revised FAR Clause 52.212-2 to include the evaluation f actors.
6. All other terms and conditions remain the same.
SEE THE ATTACHMENTS M6890925Q7912-A00001 for the Summary of Changes and M6890925Q7912-A00001 Conformed for a consolidated version with the incorporated changes including the Statement of Work.
Amendment 2 issued to affect the following:
1. Change Block 8, Of fer Due Date/Local Time to 12:00 pm (Pacif ic Standard Time), 22 July 2025.
2. Add the folloiwng bullet to the Statement of Work, paragraph 4, General Responsibilities; "The crane provider needs to arrive at AVTB a day before the test to position the crane on the AVTB compound. This preparation process, from our previous experience, takes several hours. So, the crane provider must arrive a day before the test to get set up, so that, on Day 1 at 0700 (per the SOW) we can start lifting and hanging."
SEE THE ATTACHMENTS M6890925Q7912-A00002 for the Summary of Changes and M6890925Q7912-A00002 Conformed for a consolidated version with the incorporated changes including the Statement of Work.