0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 160 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 5 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120101 TRAFFIC CONTROL SUPERVISOR DAY 160 0009 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 320 0010 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0011 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0012 130100 JOB SITE MANAGEMENT LS LUMP SUM 0013 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0014 130610 TEMPORARY CHECK DAM LF 1,500 0015 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 3 0016 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0017 141120 TREATED WOOD WASTE LB 1,730 0018 013843 CONTRACTOR SUPPLIED ARBORIST LS LUMP SUM 0019 153247 REMOVE CONCRETE (MISCELLANEOUS) (CY) CY 650 0020 018078 REMOVE CONCRETE (SIDEWALK) SQYD 5,580 0021 018079 REMOVE CONCRETE (CURB AND GUTTER) LF 8,760 0022 017547 TEMPORARY TREE PROTECTION EA 56 0023 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM 0024 190101 ROADWAY EXCAVATION CY 2,060 0025 190105 ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) CY 570