0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 610 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 8 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 40 0006 100100 DEVELOP WATER SUPPLY LS LUMP SUM 0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0009 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 24 0010 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 8,360 0011 120165 CHANNELIZER (SURFACE MOUNTED) EA 33 0012 120195 TRAFFIC DRUM EA 24 0013 014002 PORTABLE SIGNAL SYSTEMS (LS) LS LUMP SUM 0014 120320 TEMPORARY BARRIER SYSTEM LF 4,520 0015 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM