Specifications include, but are not limited to: LEAD COMPLIANCE PLAN; DISPUTE RESOLUTION BOARD ON-SITE MEETING; TRAFFIC CONTROL SYSTEM; PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM; TEMPORARY CRASH CUSHION TL-3; TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM; STREET SWEEPING 1. USACE 404 Individual Permit 2. RWQCB 401 Water Quality Certification 3. California Department of Fish and Wildlife Streambed Alteration Agreement, Notification No. EPIMS-ORA-29605-R5 4. Final Materials Report, dated November 30, 2021 (Revised February 8, 2023) 5. ADL Report, dated November 22, 2021 (Revised February 28, 2022) 6. Asbestos-Containing Materials and Lead-Based Paint Survey, dated November 22, 2021 (Revised February 28, 2022) 7. Geotechnical Design Report, Route 91 Improvements, dated November 2, 2021 (Revised April 24, 2024) 8. Geotechnical Design Report, Southwest Portion of Retaining Wall No. 110, dated December 12, 2023 9. Foundation Report, Lakeview Avenue Overcrossing (Replace), Bridge No. 55-1143, dated 1/31/2024 10. Foundation Report, Lakeview Avenue/SB SR-55 On-Ramp (New), Bridge No. 55-1144K, dated 1/31/2024