The work necessary for the completion of this contract consists of the following: Distributing door hanger notifications Placing “No Parking” signs and traffic control Posting tree removal signs Saw cutting and removing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters Constructing new concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters (utilizing pump if necessary) Removing, shaving or pruning tree roots, grading, clearing and grubbing Removing existing curb inlet decks and constructing new curb inlet decks with new hardware (includes adjusting manhole cover to grade) Removing trees, grinding stumps, root removal, regrading and resodding of parkway landscaping as necessary Patching areas of concrete curb and gutter and sidewalk Pumping concrete for improvements in park areas Restoring public and private improvements including damaged bricks, walls, turf, grass, plants, and irrigation lines Restoring survey markers damaged or displaced by the work Painting curb face and tops red where applicable Installing grass turf as necessary to match existing grass turf Removing and replacing utility boxes, valves, and cleanouts damaged or displaced by the work Providing temporary access during construction And other incidental items to complete work in place as required by the Contact Documents