0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 300 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 7 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 270 0009 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 737,000 0010 120300 TEMPORARY PAVEMENT MARKER EA 12,500 0011 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 8 0012 129161 AUTOMATED FLAGGER ASSISTANCE DEVICE DAY EA 300 0013 130100 JOB SITE MANAGEMENT LS LUMP SUM 0014 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0015 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 21 0016 130730 STREET SWEEPING LS LUMP SUM 0017 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0018 038275 MANAGE SOLID WASTE GENERATED BY THE PUBLIC HR 120 0019 141120 TREATED WOOD WASTE LB 18,900 0020 014326 REMOVE CONCRETE (VEGETATION CONTROL) SQYD 540