0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 300 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 7 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120101 TRAFFIC CONTROL SUPERVISOR DAY 300 0009 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 300 0010 120120 TYPE III BARRICADE EA 120 0011 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5,570 0012 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 166,000 0013 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 250 0014 120300 TEMPORARY PAVEMENT MARKER EA 6,340 0015 120320 TEMPORARY BARRIER SYSTEM LF 11,000 0016 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0017 124010 TEMPORARY SHUTTLE SERVICE LS LUMP SUM 0018 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 10 0019 129108 TEMPORARY CRASH CUSHION TL-3 EA 56 0020 130100 JOB SITE MANAGEMENT LS LUMP SUM