0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM 0003 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 5 0004 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0005 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0006 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0007 120101 TRAFFIC CONTROL SUPERVISOR DAY 30 0008 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 20 0009 120120 TYPE III BARRICADE EA 77 0010 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 1,810 0011 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 105,000 0012 120195 TRAFFIC DRUM EA 130 0013 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 200 0014 120320 TEMPORARY BARRIER SYSTEM LF 7,900 0015 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2 0016 129108 TEMPORARY CRASH CUSHION TL-3 EA 25 0017 129161 AUTOMATED FLAGGER ASSISTANCE DEVICE DAY EA 80 0018 130100 JOB SITE MANAGEMENT LS LUMP SUM 0019 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0020 130331 STORMWATER ANNUAL REPORT EA 3