The objective of the project to re-establish the flow path through the original spillway channel of the Cherry Valley Dam spillway and to replace the bridge deck of the Eleanor Dam Bridge, to extend the service life of the bridge until permanent improvements can be made; excavation and removal of landslide debris from Cherry Valley Dam spillway discharge channel side embankment and bank erosion protection to re-establish original discharge channel flow path; replacement of existing damaged 1” to 2” – thick concrete overlay atop the Eleanor Dam Bridge deck with new composite polyester polymer concrete as well as patch repair crack and voids in the bridge deck, girders and soffit. The work is to be performed in Tuolumne County,