Specifications include, but are not limited to: modifications to existing Telecommunications Rooms, electrical power for telecommunications, grounding for the telecommunication systems, floor and wall mounted communications racks and cabinets, communications cable tray, communications horizontal station cabling using new and existing pathway, installation of University furnished wireless access points at interior and exterior locations, demolition of existing communications riser and horizontal station cabling, and demolition of existing broadband video system. Hazardous materials abatement (ref. Div. 2) will be required to carry out the above referenced scope of work.; 1. 1 UTP6‐4, per foot, exclusive of support or termination or testing.; 2. 4 Category 6 jacks, 2 terminated at a patch panel, 2 terminated at a Work Area Outlet (WAO), inclusive of testing and labeling, exclusive of the cost of the cabling, WOA faceplate or patch panel.; 3. A pair of 12 FPP (two patch panels), rack mounted, inclusive termination, testing and labeling of terminated strands.; 4. A pair of 24 FPP (two patch panels), rack mounted, inclusive termination, testing and labeling of terminated strands.; 5. 1SR1, per foot, placed at 15’ or less above finished floor.; 6. 2SR2, per foot, placed at 15’ or less above finished floor.; 7. 2” core through concrete.; 8. 4” core through concrete.; 9. 1‐1” EMT, per foot, placed at 15’ or less above finished floor.; 10. 1‐2” EMT, per foot, placed at 15’ or less above finished floor.; 11. 1‐4” EMT, per foot, placed at 15’ or less above finished floor