This project consists of the replacement of existing outdoor lighting fixtures with new campus standard light poles and adding new light poles for roadways and pedestrian paths at the following areas throughout the UC Davis campus. The areas identified for lighting upgrades and new lighting locations include: 1. Sprocket Bikeway from California Avenue to the Housing Administration Building Roundabout 2. Lot 25 South pedestrian pathway, along Dobbins Field and Aggie Soccer Field 3. Hutchison Drive from Bioletti Way to the Teaching and Learning Complex 4. Peter J. Shields Avenue from California Avenue to "A" Street 5. Olson Hall West 6. South Core Campus neighborhood near Olson Hall Plaza, the Music Building, Wright Hall, and Ann E. Pitzer Center 7. Cushing Way from Hutchison Drive to Lot 6 Additionally, convert a shared-use path along Lot 25 South into a narrower sidewalk designated for pedestrian travel only, incorporating pathway improvements along with new landscaping and irrigation enhancements.