Specifications include, but are not limited to: Coordinate with City and designated access control company, provide traffic control, remove existing chain link fence, posts, gates and assemblies; furnish and install temporary fencing; furnish and install new steel security fencing, furnish and install rolling vehicular gates and track pads, gate operators, access control pedestals, pads, associated electrical work including loop detectors and hot mix asphalt paving;furnish and install entry- H:\ENGR\CIP\9806 PD Corp Yd Security Fence Project\Doc\14 PSE\02 Specs\Boilerplate_Non-Federal 9806.docx Rev 01/2015 28 controlled personnel access gates and exit only gate. The Contractor shall provide all labor, tools, and materials for a complete and working project in conformance with the intent shown on the drawings and specified herein and as provided for and set forth in said plans, specifications, and any addendum that may be issued prior to the date of bid, or in either of them, which said plans and specifications are hereby referred to by such reference, incorporated herein, and made a part of this Contract.