The following is an outline of anticipated tasks required to complete the Construction Engineering Services. Consultants preparing a Technical Proposal should elaborate on these tasks within their Proposal. All work shall be completed under the responsible charge of professionals, appropriately licensed in California for the type of work to be completed. • Consultant Procurement and Selection – Although the County anticipates completing project bidding with County staff, responses shall address all tasks required for soliciting bids from contractor(s). Examples of tasks may include preparing bid packages, verifying funding source requirements, responding to request for information, preparing addenda, completing public interest findings, facilitating a pre-bid meeting, and conducting bid opening. • Contract Management - Examples of tasks may include: o Assist in compiling complete contract documents; o Track status of contracts, budgets, schedules. • Regulatory Permit Compliance – All tasks associated with ensuring permit compliance. Permits typically associated with bridge construction (CWA 401, CWA 404, CFGC 1600) have been obtained. Extensions to the existing permits may be necessary depending on the timing of construction. It is anticipated that a certified biological monitor will be provided by the General Contractor throughout the duration of construction. However, the County desires that Consultants will retain the services of a qualified biologist to review notes, reports, correspondence and submittals from the Contractor supplied Biologist. It will be necessary to conduct surveys of the project site for special status plant and animal species...