The general items of work include removal and replacement of broken and damaged P.C.C. sidewalks by roots, remove and replace 6’- 8” PCC curbs, gutters, residential driveway approaches, intersection 6’ cross gutter, curb ramps on street corners to meet requirements of the ADA with truncated domes, install 4” curb drain outlets, curb marking, Install crushed miscellaneous base, install top soil, A.C Pavement repair, Install 40 PVC Pipe under sidewalk for irrigation, install curb address numbers, paint red curbs, remove and install domestic water meters/street light box and cover to grade, remove and install sidewalk around fire service water box and cover to grade, allowance for SWPPP, and other items not mentioned that are required by the plans and specifications. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above state project. The general items of work include removal and replacement of broken and damaged P.C.C. sidewalks by roots, remove and replace 6’- 8” PCC curbs, gutters, residential driveway approaches, intersection 6’ cross gutter, curb ramps on street corners to meet requirements of the ADA with truncated domes, install 4” curb drain outlets, curb marking, Install crushed miscellaneous base, install top soil, A.C Pavement repair, Install 40 PVC Pipe under sidewalk for irrigation, install curb address numbers, paint red curbs, remove and install domestic water meters/street light box and cover to grade, remove and install sidewalk around fire service water box and cover to grade, allowance for SWPPP, and other items not mentioned that are required by the plans and specifications