A. Maintenance Services: 1) Inspect generator/alternator, starter, fan and general belts, carburetor, tires, wheel lugs, tilt cylinder lever and all hydraulic cylinders for leaking, steering linkage, all connecting shafts and levers, engine, crankcase vent, and perform operational check of machine. 2) Check ignition system. 3) Check and top off where necessary, battery, tower hydraulic oil level, master cylinder, transmission and differential. 4) Clean lube fittings, air cleaner, gas filter where possible, and radiator with compressed air. 5) Lube entire machine, oil generator and starter, where necessary. 6) Replace engine oil, oil filter and air cleaner, as necessary. (Cost for items shall be included in preventive maintenance fee). 7) Provide manufacturer's required maintenance on two Clark Stand Up Forklifts. B. Repairs: 1) The CHP Project Representative, identified in Scope of Work, Item 4, shall be notified prior to performing any repairs. 2) The CHP shall pay Contractor for any parts replaced during repair at list price (not retail or marked up). 3) The Contractor's regular rate, as specified in Exhibit B, shall be limited to actual onsite time within 14 hour. 4) The Contractor's call back time shall be limited to the 1st full regular hour rate, as specified in Exhibit B, thereafter, actual on-site time within 1¼ hour.