1. EXHIBIT A (Standard Agreement) Contractor agrees to provide to the Department of California Highway Patrol (CHP), Barstow Area Office, the services described herein: furnish all supplies, materials, tools, equipment, labor, personnel, and supervision; pay all taxes, insurance, bonds, license and permit fees, and all other direct and indirect costs necessary to provide monthly Integrated Pest and Vermin Control Services in accordance with the terms set forth in this Agreement. A. Contractor shall provide a Certificate of Insurance in accordance with the Insurance Requirements found in this Agreement (Exhibit E), B. The services shall be performed at one of the following locations and to be determined at the time of award: CHP Barstow Area Office 300 East Mountain View Street Barstow, CA 92311 3. The services shall be provided during: A. Contractor agrees that all routine work on the building exterior and standard treatment of the interior shall be performed after normal working hours and shall be scheduled through the CHP facility supervisor or designee. (Normal working hours are 8:00 a.m. to 5:00 p.m., Monday through Friday). Contractor shall provide the CHP Facility Supervisor/designee seventy-two (72) hours advance notice of all routine scheduled services. SCOPE OF WORK 5. Specifications A. B. EXHIBIT A (Standard Agreement) Contractor shall maintain the following required licenses throughout the duration of this Agreement: 1) Structural Pest Control Operator License: The Contractor and agents of the Contractor performing work under the terms of this Agreement must possess and maintain a current State of California Structural Pest Control Operator license. 2) Qualified Applicator License (Category A and Category B): The Contractor and/or at least one of the agents of the Contractor performing work under the terms of this Agreement must possess and maintain a current State of California Qualified Applicator License, (Category A and Category B). 3) Branch 2 License: Contractor shall possess and maintain a Structural Pest Control Board, Branch 2 license. 4) Minimum Requirement: Any person performing pest control services for the awarded company, shall have a licensed "applicator", "operator" and/or "field representative" with the Structural Pest Control Board. Pest Control: The targeted pests include all pests such as mites, silverfish, earwigs, sow bugs, centipedes, bees, millipedes, ants, spiders, cockroaches, scorpions, fleas, and all other pests, excluding termites. C. Vermin Control: Elimination of gophers, mice, rats, ground squirrels, and any other vermin outside and within the building to be serviced. D. E. The Contractor agrees to use non-chemical or biological odorless or low odor type treatment. If this treatment is not effective, the Contractor shall move to the use of Tier 3 (least hazardous) herbicides/insecticides and then progress to Tier 2 and then to Tier 1, if necessary, to manage pests. The Contractor is responsible for adhering to this process and ensuring they are using the most current tier-rated herbicides/insecticides. At least seventy-two (72) hours prior to routine services, the Contractor must provide the CHP on- site contact with material safety data sheets on any non-chemical or biological controls to be used in the treatment of pests. F. A report naming types and amounts of non-chemical/biological or tier-rated herbicides/insecticides used at the CHP location must be submitted with each service. The submittal shall be signed by the CHP on-site contact.