System Operations Contractor Shall: 1. Inspect entire system at least two times per week (52 weeks per year); 2. Monitor system performance and adjust system as often as necessary to maintain quality standards specified in the CRWQCB permit requirements; 3. Maintain a log on all waste water maintenance and adjustments, and maintain all records as required by CRWQCB. A. System Maintenance Contractor Shall: 1. Implement a preventative maintenance program to provide system adjustments, lubrication, and routine maintenance. Preventive maintenance program that conforms to the scope of work contained herein shall be submitted to Project Manager or designee for approval within seven (7) calendar days subsequent to the award of the Contract; 2. Perform preventative maintenance at least once per month; 3. Prepare and submit system maintenance reports to the Project Manager or designee, within three (3) calendar days subsequent to the inspection, additional maintenance as required in accordance with CRWQVB permit requirements. B. Lab Work Contractor Shall: 1. Perform tests at least one (1) time per week: a. Mixed Liquid Suspended Solid (MLSS) b. Mixed Liquid Volatile Suspended Solid (MLVSS) c. Effluent Suspended Solid (ESS) d. Effluent Turbidity Tests (ETT) 2. Prepare and maintain quality assurance records (log book entries); 3. Perform additional sampling and as required to meet CRWQCB requirements.