0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 250 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 7 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 20 0009 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 16,800 0010 120165 CHANNELIZER (SURFACE MOUNTED) EA 120 0011 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 40 0012 120300 TEMPORARY PAVEMENT MARKER EA 310 0013 120320 TEMPORARY BARRIER SYSTEM LF 10,300 0014 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0015 129108 TEMPORARY CRASH CUSHION TL-3 EA 6 0016 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 6 0017 130100 JOB SITE MANAGEMENT LS LUMP SUM 0018 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0019 130321 STORMWATER SAMPLING AND ANALYSIS DAY EA 12 0020 130331 STORMWATER ANNUAL REPORT EA 3