The work to be done consists, in general, of the maintenance of six (6) bridges through installing new or repairing existing scour countermeasures and conducting other maintenance activities at each location. Vegetation and trash will be removed from the channel at each location and a dead tree at Location 3 will also be removed. The locations of work are as follows: • Los Gatos Road over Los Gatos Creek (Bridge No. 42C0455) • Los Gatos Road over Los Gatos Creek (Bridge No. 42C0458) • Los Gatos Road over Los Gatos Creek (Bridge No. 42C0459) • Excelsior Ave. over Fresno Slough (Bridge No. 42C0104) • Excelsior Ave. over Fresno Slough Overflow (Bridge No. 42C0367) • S. Alta Ave. over Travers Creek (Bridge No. 42C0179)