The project will consist of unclassified excavation, including saw cutting, removal, and disposal of asphalt, vegetation, and miscellaneous debris. The existing soil shall be removed and stockpiled on site for reinstallation. Additional soil will need to be imported. The slope shall be reconstructed using slope benches and reinforced with Geogrid. Installation of geojute erosion control fabric over the entire slope face and installation of drought-resistant landscaping. Provide a point of connection and tap into the existing water line to install a 4-zone irrigation system with a temporary solar irrigation controller with no cabinet, all conduits, valves, and appurtenances to be furnished and installed. Pave new 4” asphalt over compacted subgrade with a new redwood header along the edge. The Contractor shall install and maintain all project erosion control and BMPs per the WPCP. The Contractor shall set up and maintain the staging area north of the lower beach path only, the staging area to be enclosed with temporary fencing with a wind screen. The Contractor shall provide a traffic control plan to maintain a minimum of 12’ of pedestrian access in the upper beach path during all phases of construction. The Contractor shall furnish, install, and maintain all traffic control during construction. The Contractor shall remove and dispose of any and all equipment and material used to maintain pedestrian access. The Contractor shall make sure that there is access to both the lower and upper beach path at all times. The Contractor shall provide flaggers when their vehicles are traveling on either of the beach paths.