Specifications include, but are not limited to: Design, fabricate, ship, assemble, test, startup, commission, warrant and make ready for service two fully functional BESS and balance of plant equipment that meets or exceeds all requirements of the project each sized a minimum of 1MW – 1MWh. All required equipment, materials, labor and tools required to install, test, and commission the BESS’s. Provide on-site training classes for SCJCD operators, engineers, technicians and maintenance personnel. Provide operations and maintenance costs for 10 year intervals. Provide a minimum ten-year warranty for inverters and bulk of system with a ten-year warranty for batteries and a separate cost breakdown Supply an initial complement of spare parts