1 100,000 F.A. Supplemental Work At Force Account (Unforeseen Differing Site Conditions, Utility Conflict, Potholing Repair, and Pavement Patching) $ 1.00 $ 100,000.00 2 1 L.S. Water Pollution Control Program $ $ 3 1 L.S. Mobilization $ $ 4 1 L.S. Clearing and Grubbing $ $ 5 1 L.S. Develop Water Supply $ $ 6 1 L.S. Finishing Roadway $ $ 7 1 L.S. Quality Control Program $ $ 8 1 L.S. Traffic Control System $ $ 9 2 EA. Portable Changeable Message Sign $ $ 10 900 S.Y. Remove Asphalt Concrete Surfacing $ $ 11 2,500 S.Y. Remove Concrete (Sidewalk, Ramp, Spandrel, and Cross Gutter) $ $ 12 370 L.F. Remove Concrete (Curb and Gutter) $ $ 13 6 EA. Reset Roadside Sign $ $ 14 1 L.S. Landscape, Sprinkler and Irrigation System $ $ 15 31,000 S.Y. Cold Plane Asphalt Concrete Pavement (0.12' THK) $ $ 16 15,100 S.Y. Cold Plane Asphalt Concrete Pavement (0.15' THK) $ $ 17 4,000 TON Asphalt Concrete (Type A, 1/2-inch Aggregate Gradation, PG 64-28 PM) $ $ 18 160 TON Asphalt Concrete (Type A, 3/4"-inch Aggregate Gradation, PG 64-28 PM) $ $