Scope of work shall also include: • Asphalt Maintenance work to be conducted at the TDPUD main headquarter facility will be performed during non-business hours and should be considered weekend only work. All bids submitted are to reflect after hours or weekend scheduling to limit impacts to Utility Operations • Asphalt Maintenance work to be conducted at the TDPUD main headquarter facility will include parking lot striping to be performed in the main parking lot, employee parking lot, and several areas within the fenced yard. The Customer and Employee parking areas are located outside of the gated facility maintenance and vehicle yard. Parking space striping cost for the TDPUD Main Headquarters should be included with the seal treatment cost on Schedule A for this location. • Asphalt Maintenance work at electrical substations and water property locations can be performed midweek. • Work inside of substation perimeter fencing will require safety training and access by TDPUD electric staff. • Performance of all work in a safe and environmentally friendly manner. • Mobilization and demobilization to the site location • Asphalt preparation to include, weed removal, pressure wash cleaning, and crack and gap cleaning of loose debris and vegetation. • Contractor will be responsible to provide portable bulk water vessel (trailer or truck mounted) for the performance of pressure washing at each site. TDPUD will assist Contractor to provide access to each site and access to fill water at a designated hydrant or at a bulk fill station for the contractor’s performance of pressure washer cleaning. • Haul off of all debris and job site clean-up.