Demolition • Remove and replace all flooring. • Casework (partial): o Preserve casework located at the back wall of the computer lab. o Relocate casework currently at the curtainwall of the computer lab to the north wall (provide new countertop as required). o Retain casework located in the center office. • Remove existing electrical wire mold along the curtainwall. • Remove curtainwall in the computer lab. • Remove existing ACT ceiling tiles and replace with new tiles. Interior Modifications • Construct a divider wall to split the main library area into two classrooms. o Provide a door in the divider wall to allow access between classrooms. • Add a kitchenette area with sink along the east wall of the existing computer area. • Modify two existing offices: o Retain as offices. o Remove interior windows and infill as required. • Convert one existing office and remodel an existing bathroom into child restrooms: o Provide two child toilets per restroom. o Install child sinks and faucets. o Incorporate visibility requirements (e.g., Dutch doors or hardware modifications) as required. Exterior Modifications • Install a new exterior door at the north side of the building to provide access to the newly sectioned area. o Provide new concrete walkway section to connect to the existing pathway. • Replace existing roofing, including entry canopy Mechanical, Electrical, and Plumbing (MEP) • Lighting: o Provide one light switch for each of the two new main rooms. o Existing lighting in small rooms and restrooms to remain as-is. • Electrical Outlets: o Retain existing outlets located high on walls. • HVAC: o Replace existing HVAC units and associated controls. Additional Requirements • Retain and reuse tack wall material to the greatest extent possible.