3 Detail Description of Work: The contractor will be expected to provide electrical service as specified: Replace a 6 Meter Electrical Panel for Building 1, units #1 – 6 and Building 3, units 13 – 18. 14.3.1 Prep surface 14.3.1.1 Contractors shall provide all equipment, material, supplies, traffic control, and labor as required. 14.3.1.2 The contractor is responsible for acquiring city permit, all certification, payment of fees and expenses that may be mandated requirement for this project. All paperwork and fees must be included within contractors bid price. 14.3.1.3 Work Schedule: The Contractor and IVHA Contract Officer shall agree upon a schedule of time and order of work for the project to prevent a long period of down time for tenants and the performance of the Contractor’s services. Such shall be based upon reasonable times for review, approval and return of the documents. IVHA estimates that this job should take less than 30 days from the award of contract. IVHA is aware that the start time for construction may be delayed due to purchasing and production of material. 14.3.1.4 Contractor shall perform preparation and cleaning procedures in strict accordance with the manufacturer’s instructions for the substrate condition. 14.3.1.5 Contractor shall assist with IID application and scheduling. 14.3.1.6 Demolition removal of existing 6-meter electrical panel. Location of panels are on Section 15.1 and 15.2 on page 11. 14.3.1.7 Install new 6-meter panel, 600-amp bus rated 6 meter according to NEC requirement. Installation must meet all city codes and guidelines. Please see diagram 15.3 for sample of installation for your reference. 14.3.1.8 Install 6 new 100-amp sub-panel next to new meter to separate existing circuits for sub panels and a/c disconnect as shown on Section 15.3 on page 17. 14.3.1.9 Reroute air conditioner circuits to exterior sub panel using conduit. 14.3.1.10 Install 6”x6”x48” wiring trough, Nema Type 3R under meter box as shown on diagram Section 15.3 on page 12. 14.3.1.11 Install 3” rigid conduit with 2 sets of 350 mcm. 14.3.1.12 Replace weather heads with updated weather heads to meet code requirements. 14.3.1.13 Install 2/0 bare solid copper, ground rods ¾” 6’ apart. 14.3.1.14 Contractor must make necessary repair to bring electrical up to code. 14.3.1.15 Dispose of all debris resulting from work on a daily basis.