Installation of a new hybrid positive displacement screw blower to replace an existing diesel engine driven blower, new motor control centers (MCC) in the Blower Building, new aeration system controls and instrumentation, new aeration control valves and flow meters for Aeration Basins Nos. 1, 2, and 3, new motor operated control valves for existing blower air inlets, power monitoring and integration into SCADA for various existing MCCs, a new fire alarm control panel for the Blower Building, replacement of other electrical gear throughout the plant including MCCs and a transformer, underground electrical conduit and associated site work, HVAC and odor control improvements including heating and cooling equipment and an exhaust fan, and other ancillary equipment and demolition work as indicated in the Contract Documents.