The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the contract documents. The work to be performed includes the following activities for this contract: The site preparation consists of removal and dispose of a segment of PCC sidewalk, three (3) handicap ramps and two (2) sections of asphalt pavement to accommodate new alley driveway approaches, as well as clearing/leveling/grading the areas for new sidewalks. The construction includes, but not limited to, PCC Sidewalks, three (3) PCC Handicap ramps, two (2) PCC Alley Driveway Approaches and four (4) Under-Sidewalk Drains per construction project plans in Appendix C, as well as traffic control signs around the construction zone for the entire duration of the construction. All work to be completed within existing City of Imperial public Right-of-Way. The scope of work includes, prior to the start of construction, the coordination between the City of Imperial and the Contractor. Testing and Studies called for shall be paid by City.