This project consists of installing approximately 1000 feet of 12-inch C900 DR-14 PVC recycled water main with fittings, valves, and appurtenances in accordance with UCI Facilities Management Master Specifications, UCI Facilities Management Campus Standards, and Details. Where applicable, IRWD details may be incorporated by the University for its convenience. For reference, further details are provided herein. They are not exhaustive of all the work of the project, which is more fully described in the contract documents, sketches, and referenced details. The main route passes through the iconic Aldrich Park portion of the campus, between irreplaceable signature trees, which must be protected in place during the project. Otherwise, the route is largely through grass-covered areas with small asphalt pathways. The contractor will provide surveyed record drawings that show every aspect of the work in both horizontal and vertical arrangements.