Sources Sought Only
Drawings are available upon request and approval.
Fabricate a Control Console to include interfaces to perform the following:
o Detect and indicate PIN-to-SOCKET proper alignment (performed by CR Adapter’s Photo Sensors). This can be
accomplished by using green/red LIGHTS for a go/no-go condition, respectively.
o Engage/disengage SOCKETS and PINS (performed by the CR Adapter’s pneumatic actuators). This can be
accomplished by using green/red PUSH-BUTTONS for a go/no-go condition, respectively. The actuators’ limit
switches need to be monitored during extend/retract operations.
Provide support during the onsite installation at Missile-Intermediate Level Maintenance Facility (M-ILMF) to monitor
the following:
o Connection of the Control Console to the facility-provided Electrical Power Receptacle, including connections to
the Power Supply, Photo Sensors, Limit Switches and Pneumatic Actuators’ Solenoid Valves
o Connection of the Pneumatic Actuators to the facility-provided Compressed Air Drop
o Ensure satisfactory performance of the completed Control System after installation