WORK DETAILS Technical Specifications The Contractor shall provide all personnel and equipment to complete the work outlined as described herein. The Contractor, as well as any subcontractor, shall provide a production schedule for printing, binding, and delivery of the product to OSP and the mail house. The OSP will provide previous VIG book samples upon the Contractor's request. Ink Option 1: The first eight (8) pages and the last eight (8) pages print 3/3; black + 2 PMS. The balance of pages to print 1/1; black/black. Bleeds on the outside front cover and tabs throughout the book. Option 2: All pages print 1/1 black throughout book. Bleeds on the outside front cover and tabs throughout the book. Bindery The Contractor shall provide saddle stitching options for the Contractor’s printed signatures and OSP potential printed signatures. Option 1: Contractor to provide bindery saddle stitching of Contractor's printed signatures. Option 2: Contractor shall provide bindery saddle stitching of OSP printed signatures. This must include the pick-up of material from 885 Riverside Parkway, West Sacramento, CA, and final delivery to the mail house as specified below in subsection (F). Paper Stock OSP will supply the paper stock for the initial quantity ordered. Paper stock will be 35" wide, 50" OD rolls - 27.7# newsprint, 40%-60% postconsumer waste (or equivalent). The Contractor shall pick up the paper stock at an OSP-designated storage facility in the Sacramento or West Sacramento areas. Prior to the Primary and General Elections, OSP will notify the Contractor of the exact location(s) for paper pick up.