Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as 2025 Pavement Management Program Project, according to drawings and specifications as prepared by the City of Saratoga and according to the Contract Documents. The work to be done consists of supplying all labor, methods or processes, implements, tools, machinery, equipment and materials to for the construction of asphalt concrete overlay, micro-surfacing, repair failed street sections, crack seal, striping, utility adjustment, curbs and gutters, storm drain systems, traffic control and other work not specifically mentioned herein, but which may be required as directed by CITY or its designated representative.