1. 1 MOBILIZATION at: ________________________________________ ____________________________________per LS N/A $_______ 2. 1 DUST CONTROL at: ________________________________________ ____________________________________per LS N/A $_______ 3. 1 MAINTAIN TRAFFIC AND DETOURS at: ________________________________________ ____________________________________per LS N/A $_______ 4. REMOVE & REPLACE/CONSTRUCT PORTLAND CEMENT CONCRETE (PCC) 4.1 111 REMOVE & REPLACE PCC CURB & GUTTER (A-1 or A-2) at: ______________________________________ __________________________________per LF $______ $_______ 4.2 72 REMOVE & REPLACE PCC RESIDENTIAL SIDEWALK at: ______________________________________ __________________________________per SF $______ $_______ 4.3 20 REMOVE & REPLACE PCC SPANDREL at: ______________________________________ __________________________________per SF $______ $_______ 4.4 356 REMOVE & REPLACE PCC RESIDENTIAL DRIVEWAY APPROACH at: ______________________________________ __________________________________per SF $______ $_______ 4.5 22 REMOVE & CONSTRUCT PCC CURB RAMP at: ______________________________________ __________________________________per EA $______ $_______ 5. 125 REMOVE ROADWAY STRUCTURAL SECTION at: ________________________________________ ____________________________________per CY $______ $_______ 6. 39 UNCLASSIFIED EXCAVATION at: ________________________________________ _____________________________________per CY $______ $__ 7. 16 ADJUST MANHOLE TO GRADE ________________________________________ ____________________________________per EA $______ $_______ 8. 1 ADJUST UTILITY & VALVE BOXES TO GRADE: _____________________________________per EA $______ $_______ 9. 19,201 COLD MILLING at: ____________________________________________ _________________________________________per SY $______ $_______ 10. 1,920 TACK COAT at: ________________________________________ ____________________________________per GAL $______ $_______ 11. 125 HOT MIX ASPHALT (HMA) at: ________________________________________ ____________________________________per TON $______ $_______ 12. 1,423 ASPHALT RUBBER HOT MIX (ARHM) at: ________________________________________ ____________________________________per TON $______ $_______ 13. 1 TRAFFIC STRIPPING AND PAVEMENT MARKINGS LS N/A $_______ 14. 200 CONCRETE GRIND SF $______ $______