A. Includes all labor, materials, and equipment to install a Cold Applied 2-Ply Thermoplastic Hybrid Roof System roof (KEE-Stone FB 60) over the properly prepared substrate. B. Includes removal and disposal of existing roofing system(s), insulation board, flashings, sheet metal items, copings, etc. for a complete prepared roof surface to receive the new roofing system. C. Includes a new cold applied KEE-Stone 2-ply hybrid roofing system with all accessories needed for a complete warrantable roofing system D. Inspect roof deck and perform any repairs necessary. All dry rot repair to be documented. E. Eliminate all abandoned curbs as marked by district. F. Install 1/2" Densdeck Prime board G. Raise all penetrations to 8” minimum height. H. Install new pipe jacks and boots at all penetrations. I. Includes 150 Linear feet of fascia replacement painted to match. J. Includes ~25 feet of gutter and associated downspouts replacement on the North Western side of the roof. The rest of the gutters are to be reused. K. Install new getter strapping on all existing gutter that is being reused. L. Includes a new cold applied 2-ply hybrid roofing system with all accessories as needed for a complete warrantable roofing system. M. Include a per board replacement cost for the soffit as a line item with the bid.