The work necessary for the completion of this contract consists of preparing mock-ups for City approval prior to commencing work for each work location and for differing painting surfaces, removing cracked, peeled, and nonadherent paint; removing rust, dirt, or bird droppings; repairing and patching damaged exterior surfaces; cleaning, preparing, and painting exterior surfaces; refinishing stone veneers, removing stone veneers and matching to existing exterior surfaces, and removing existing signs and installing new or refurbished signs as noted on the plans. Exterior surfaces shall include, but not be limited to the following, aluminum trellises, beams, bollards, building surfaces, CMU walls, downspouts, exterior doors, exterior wood roof, fascia, fences and gates, gutters, overhead doors, railings, signages, sunshades, windows, wood surfaces, and additional areas as noted on the plans as specified in the contract documents at the following locations: 1. Civic Center (100 Civic Center Drive) 2. Central Library (1000 Avocado Avenue) 3. Carroll Beek Community Center (115 Agate Avenue)