o 3 Layer Treatment System consisting of Type II Slurry Seal (top layer), Asphalt Rubber Chip Seal (middle layer), Type III Microsurface (bottom layer) for sections of roadway along Rose Drive between Primose Lane and Panorama Drive. o Grind and replace 6 inches of HMA for sections of roadway along Rose Drive between Primose Lane and Panorama Drive. o Base Failure Repairs of 12 inches in depth for sections of the roadway along Rose Drive between Primrose Lane and Panorama Drive. o Type II Microsurface Treatment along Rose Drive between Panorama Drive and McAllister Drive o Striping of traffic lanes, crosswalks, and bicycle lanes along Rose Drive between Primose Lane and McAllister Drive. o Intersection of Panorama Drive and Rose Drive: Construction of 4 curb extensions with pedestrian accessible curb ramps, replacement of signs, high visibility crosswalks, and re-stripe of all traffic markings.