Specifications include, but are not limited to: 1. Clear snow from the surface of Lisa Maloff Way and ensure snow berms created from U.S. Hwy 50 (Caltrans) snow removal operations are removed allowing access into and out from the airport. Clear snow starting at the terminal frontage curbs and pile snow west along the sidewalk and retaining wall in front of the parking lot. Clear fifteen vehicle parking spots along the Eastern row of the public airport parking lot during any storm daily before 06:30 am Pacific Time (Frequency storm to storm when snow accumulation reaches depth of 3” or more. May require more than one visit by Contractor in one day if conditions warrant) 2. Clear the remaining vehicle parking spaces in the public parking lot by pushing snow West towards U.S. Highway 50. Clean up snow on Airport Road providing for two lanes at the entry and exit and the single lane road access to the City owned hangars and the other single lane road access to Gate V1. (Frequency storm to storm when snow accumulation reaches depth of 3” or more. May require more than one visit by the Contractor in one day if conditions warrant) 3. Post storm event, Contractor will clear in between hangar buildings pushing snow east and piling the snow as far East along Taxilane Delta. Snow will be piled on Taxilane Delta in a manner that allows for City personnel to use a Kodiak blower to throw the snow accumulated from the hangar rows into the West Airport Storm Water Ditch. There are two solutions. Solution one is to use a loader to push and pick up snow depositing it into the stream area (clear of the taxiway surface). Solution two is to spread the snow out along Taxiway Delta so that it is no more than 5 feet high (tall) so that the Airport Kodiak can come in after and blow the snow into the stream area.