-Remove and dispose of existing splined ceiling tiles -Remove and dispose of existing lights -Remove and dispose of existing carpet -Remove and make safe three electrical floor monuments and cover holes -Provide and install 12 new light fixtures and three new light switches: Lithonia Stack Lay-ins STAK 2X4 4000LM 80CRI 40K COL MIN10 ZT MVOLT, 2ft x 4ft LED. Light switches to be Sensor switch WSXA Series. -Provide and install two new electrical outlets in new walls. 1 electrical outlet per new office space. -Provide and install new walls to create two separate offices from the existing space. Walls must be insulated with R-12 fiberglass and made of 5/8” drywall and framed with tin can studs. -Provide and install two new 3-0 X 7-0 X 1 ¾” stain grade wood doors with Schlage ND53PD- RHO626 in new Timely door frame. -Provide and install new nylon carpet square tiles and new thresholds where new carpet finishes to existing carpet. Mohawk 24”x24” Berber(Loop pile) .09” Pile Height, Carpet Tile, PET Fiber, Ocean Deep color. Or equivalent. -Provide and install new 4” inch base board -Provide and install two new A/C grills from existing air supply. -Relocate existing thermostat to Hallway, adjacent to new office. -Relocate existing fire alarm to Hallway, adjacent to new office. -Patch and paint existing and new walls Beige. Color code DEW358 Milk Glass -Paint see through tiles in existing wall. -Provide and install new t-bar ceiling grid and 2’ft x 4’ft tiles.