The City of Pleasanton is seeking proposals to remove and dispose of approximately 10,000 – 15,000 cubic yards of asphalt millings stockpiled at Bernal Community Park near intersection of Pleasanton Avenue and Bernal Avenue. Currently, off-hauling of materials is taking place and shall be assumed to be in place during the contract. The millings were placed in a stockpile between 2021 and 2024, with the majority of the millings stockpiled in 2024 from the milling operations of the last year's streets resurfacing project. The millings generally meet Class 2 aggregate base when placed in the stockpile, but do have some mixed larger 6-to-8-inch asphalt chunks, 6-8”. The stockpile did have trucking on the surface, but was graded last fall and covered with tarps. The millings include ground Petromat. Vulcan Materials has agreed to accept the materials at no cost, but the millings can be disposed of by an approved legal disposal or reuse facility. The work shall include the full removal and disposal of the asphalt milling down to dirt, installation of Best Management Practices (BMPs), removal and disposal of the silt fence after areas are reestablished with vegetation, and folding and palletizing the tarps.
All work to be performed shall be in accordance with the City of Pleasanton Standard Specifications and Details* dated July 2024, and shall be overseen by the Engineering Division