The work consists generally of construction including: Survey and mark-outs, traffic control and public convenience and safety barricades / plates / signage / ventilation / lighting / power / shoring (with related wet stamped engineering) and jacking, cleaning of existing pipeline as required, performing CCTV inspection of existing pipeline prior to lining process, performing point repairs, performing CIPP trenchless lining, replacing pipeline, re-establishing tie-ins / laterals, jacking depressed sections of pipe into place or re-rounding into place, performing CCTV
post lining inspection, related concrete / concrete reinforcement, slurry, and
grouting activities, replacing all removed property features including but not
limited to landscaping / trees / fencing / subgrade / sidewalk / finish surface /
striping and markings, replacement of all damaged property features including but
not limited to landscaping / trees / fencing / subgrade / sidewalk / finish surface /
striping and markings as a result of any construction activities, construction
dewatering, removing spoil material, and compliance with all applicable storm
water pollution prevention (NPDES) requirements and BMPs.