Specifications include, but are not limited to: The project consists of selective site demolition, earthwork, concrete, asphalt, landscaping, site electrical, water line, storm, and sanitary sewer. This will include, but not be limited to: demolition as required; undercut and remove unsuitable materials; replacement of unsuitable materials with specified material; subgrade preparation; base course construction; concrete pavement course; asphaltic concrete hot-mix binder course; asphaltic concrete hot-mix surface course; milling and inlay of existing pavement as indicated on the drawings; striping; signage; pedestrian pole installation; and all other items identified in the Contract Documents or required to complete the work. Additional work includes erosion and sediment control; maintenance of traffic; water utility modifications, water, storm, and sewer pipe installation.